Energy plant - TURIN

In the Piedmontese capital Edil Steel has built steel structures for the new energy plant.

The logistical and operational difficulties, due to the particular type of system in the plant, which provides continuous connections between the structural and engineering parts, have been successfully addressed and managed by Edil Steel thanks to the extraordinary charge of its design capacity and commitment at all stages work, all of which has been possible to complete the supply and fittings on site in record time of 100 days.

1200 tons of steel has been used inside the plant.

Project details

  • Completion date: 2011
  • Place: Turin
  • Customer: CNIM
  • Categories: Industrial infrastructure
  • Tonnage: 1.200 t.

Gallery