Road bridge - Torino di Sangro (CH)

Metal bridge built by ANAS SpA.

The bridge was realized with three spans three bays arranged on each of more than 50 m. The 9 girders presenting with a length of over 36m and have been, once transported in work, welded in the pipeline by the installation of batteries stamp within the riverbed.

Project details

  • Completion date: 2014
  • Place: Torino di Sangro (CH)
  • Customer: A.N.A.S. S.p.A.
  • Categories: Bridges
  • Tonnage: 600 t

Gallery