New Painting and Stamping center FCA - Cassino (FR)

Also during the renovation of the new painting and stamping area in the FCA factory in Cassino, Edil Steel was the protagonist with the supply and the assembly of over 2200 tons of steel structures.

Edil Steel assumed in the site an excellent organization of the operating system. This is necessary and essential for working in FCA-sites where it is always required the maximum efficiency.

In less than 60 days all steel structures were installed

Project details

  • Completion date: 2008
  • Place: Cassino (FR)
  • Customer: FCA
  • Categories: Industrial infrastructure
  • Tonnage: 2.200 t.

Gallery